Search Results

Search results for “Underground parking structure”

Found 8 item(s) that matched your query.

Novartis/Necco Center

Date Posted: November 10, 2009

Cambridge, MA—Renovation of existing Necco candy factory into biotech facility with new 6-story atrium and 3-level, 400 car underground parking garage.

Karp Family Research Center

Date Posted: November 11, 2009

Children's Hospital, Boston, MA—High rise laboratory research building; 12-story new construction, structural steel with glass and precast curtainwall.  Project also included a 5-level 300 space underground cast-in-place parking garage.

MIT Dorm

Date Posted: November 11, 2009

Cambridge, MA—455 unit graduate student dormitory with underground parking.

Boston University Dorm

Date Posted: November 11, 2009

Boston, MA—Graduate student housing project constructed on a constricted urban site. Project includes 220 units with underground parking and a ground floor café.

Halstead at Arlington

Date Posted: November 11, 2009

Arlington, VA—8-story mixed use building with 3 levels (190,000 SF) of underground parking.  Includes first floor office and retail space, complete with medical clinic.  Floors 2-8 consist of 269 luxury residential units including a fitness center, club room, business center and...

Atlantic Wharf

Date Posted: November 23, 2009

Boston, MA—Mixed use development composed of 610,000 SF office space and 220,000 SF potential residential space; 6-level 125,000 SF underground parking garage; separate 7-story existing historic building.

King Street Hotel

Date Posted: November 10, 2009

Alexandria, VA—The existing historic structure was completely re-pointed, new architectural windows were installed, along with a new standing seam copper roof.  The interior 2nd floor was removed to create a vaulted ceiling for a Wine Bar Bistro, with a brick oven pizza oven known as...

Harvard Banks Cowperthwaite Grant

Date Posted: November 11, 2009

Cambridge, MA—New student housing with 2 1/2 levels of underground cast in place post tension 185 space parking garage.

Testimonial

Our experience with Moriarty ranges from commercial to civic projects.  They bring knowledge on pricing, schedule and procurement that helps the design and ownership team make important decisions early in the process.  Their management of the process and the construction is a problem-solving approach to the work.  We are a team and they see the skills and experience that we all bring to the project.  They have been practicing an integrated approach to construction services long before it became a trend.  The professionalism that comes to the project is extraordinary and there is a very human passion that they bring as well.  In the end we have a great project and have made life-long friends.

From: Robert Brown, CBT Architects