Search Results
Search results for “Historic”
Found 8 item(s) that matched your query.
Wyndham Hotel at Batterymarch
Date Posted: November 10, 2009
Boston, MA—A complete gut, rehab and renovation of 89 Broad Street in Boston's financial district into a 360-room luxury hotel completed while being occupied by Northeastern University as a classroom facility.
Novartis/Necco Center
Date Posted: November 10, 2009
Cambridge, MA—Renovation of existing Necco candy factory into biotech facility with new 6-story atrium and 3-level, 400 car underground parking garage.
Completion of Atlantic Wharf
Date Posted: April 8, 2011
The 2011 Completion of Atlantic Wharf
Slatersville Mills
Date Posted: November 12, 2009
...Smithfield, RI—Rehab of [Historic] property complex into 228 residential units and clubhouse....
The Lorien Hotel & Spa
Date Posted: November 10, 2009
...Alexandria, VA—The existing [Historic] structure was completely re-pointed, new architectural windows were installed, along with a new standing seam copper roof. The interior 2nd floor was removed to create a vaulted ceili...
The Lorien Hotel & Spa
Date Posted: December 2, 2011
...Alexandria, VA—The existing [Historic] structure was completely re-pointed, new architectural windows were installed, along with a new standing seam copper roof. The interior 2nd floor was removed to create a vaulted ceili...
Completion of Liberty Wharf
Date Posted: June 1, 2011
...John Moriarty & Associates, Inc. is pleased to announce the completion of Liberty Wharf, located on [Historic] Boston Harbor. The development provides spaces for restaurants, outdoor dining, commercial offices, boardwalk, rooftoop terraces and marine slips that will contain over 500 linear fee...
Atlantic Wharf
Date Posted: November 23, 2009
...ston, MA—Mixed use development composed of 610,000 SF office space and 220,000 SF potential residential space; 6-level 125,000 SF underground parking garage; separate 7-story existing [Historic] building....
Testimonial
Our relationship with JMA, which spans two decades and over a dozen major projects, can best be summed up in three words – teamwork, trust and delivery. They hold themselves and their subcontractors to the highest standards and set a tone of collaboration that all the team members want to adhere to; we have complete confidence in their commitment to the job and the client as their highest priorities; no matter how complex the project or demanding the schedule, they always perform above our expectations.
From: Jonathan G. Davis, The Davis Companies